Baker Hughes required storage for 6 flexible flowlines for up to a year at the Port of Blyth. A loading tower was required at a barge to load static tanks – 1 flowline per static tank.
As multiple campaigns were foreseen, a modular loading tower concept has been inhouse engineered and build – to enable road transport being more economic than by ship for multiple campaigns.